When a pavement system is close to the end of its life cycle, the existing surface should be overlayed with a new layer of asphalt to extend its wear life. However, care must be taken to address all cracked areas in order to prevent translation of cracks through the new surface.
All broken areas that move under the weight of a loaded truck must be repaired with full depth asphalt. Isolated cracks must be sealed with a hot pour crack sealer to retard reflective cracking.
| Resurfacing | | Print | |
Communicate with tenants, distribute, post schedule. All cars must be cleared from each work section.
For additional information about the Pavement Network´s complete asphalt resurfacing services, or to receive an estimate, please contact us. |